FUJI Silvertech was tasked with building the stormwater drainage system for the Narendra Modi stadium in Ahmedabad.
The major challenge of this project was the requirement of a curved stormwater drainage system and the short construction timeline the project needed to be completed within.
FUJI Silvertech designed, manufactured, and supplied customised drainage infrastructure for the Narendra Modi Stadium’s field of play within the given timeframe.
The biggest challenge was designing a stormwater drainage system that drains the field of play within 30 minutes, even with the heaviest rainfall. However, our exceptional team, manufacturing capabilities, and standardised processes helped us meet this challenge without difficulty.
With 58 variations of drains and 19 variations of lids, this project was significantly customised and required the highest number of size variations in the components delivered by FUJI Silvertech. With our post-delivery consultation, the time challenge was met thanks to night-time construction and parallel construction, achieving a speed of up to 12 meters per hour.
Manufactured with Japanese Industrial Standards (JIS), this is the first time such a system has been adopted in India.
This tailored stormwater drainage system has numerous benefits: